Turn-Key Project Highlights and Capabilities

  • Turnkey Project Highlights

    • Sunoco Pipeline

    • 2013

    • Corsicana and Ringold, Texas

    • The project is a crude oil pipeline utilizing 4 medium voltage VFDs in three control houses; including associated medium voltage starters, switchgear, and disconnect switches.

    • This project had an extremely tight timeline for completion. The project included turnkey solutions, with control houses (3) supplied by Benshaw. The available time to start 4 medium voltage VFDs in a control house was four days once power was applied.

    • Mark West Pipeline

    • 2014

    • Marcellus Region - Ohio

    • This project is a gas pipeline application for constant torque, running with synchronous transfer switching capabilities. The project included four Medium Voltage VFDs.

    • The customer required premium efficiency medium voltage VFDs with extremely low losses. The location had a deficiency in HVAC cooling, therefore could only accommodate a low heat loss VFD, required within a very aggressive delivery schedule.